[{"id":35557,"date":"2026-10-07T14:45:53","date_gmt":"2026-10-07T18:45:53","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35557"},"modified":"2026-10-07T15:28:29","modified_gmt":"2026-10-07T19:28:29","slug":"greener-gathering-spaces","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/","title":{"rendered":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--white umw-hero--with-no-media umw-hero--with-no-content\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">Greener Gathering Spaces<\/h1><\/div><\/div><\/div><\/div><\/section><h2 id=\"h-greener-gathering-spaces-for-campus-with-updates-for-westmoreland-mason-and-randolph-lawns\" class=\"wp-block-heading\">Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns<\/h2><p class=\"wp-block-paragraph\">Over the next several weeks, UMW Landscape and Grounds will begin improvements to two well-loved outdoor spaces: the lawn in front of Westmoreland Hall and the area between Mason and Randolph Halls, affectionately known as &ldquo;the Beach.&rdquo;<\/p><p class=\"wp-block-paragraph\">Both areas require soil removal and remediation.&nbsp;<strong>&ldquo;The Beach&rdquo;&nbsp;will receive irrigation and new Bermuda sod<\/strong>&nbsp;and will be temporarily closed to pedestrian traffic as the&nbsp;sod&nbsp;takes root.&nbsp;<strong>Westmoreland Lawn will be graded and overseeded with Fescue grass seed<\/strong>. Portable irrigation will be used here. Sidewalks around the area remain open and accessible and should be used as the primary paths around the green spaces.<\/p><p class=\"wp-block-paragraph\">The project is scheduled to begin the week of Sept. 21, starting with trenching for the irrigation, followed by soil preparation with compost, and then installation of the sod about a week or two later, depending on the weather. The sod will need approximately six weeks to establish strong roots and knit together before it can accommodate foot traffic.<\/p><p class=\"wp-block-paragraph\">During this project period, short fencing will encircle both green spaces, which will be offline for events for a period of time. Other outdoor spaces such as Alvey Green, Ball Circle and Jefferson Square are open for activities and events this fall, including the&nbsp;<a href=\"https:\/\/www.umw.edu\/familyweekend\/schedule-of-events-2026\/\">UMW Tree Festival during Family Weekend on October 2<\/a>. Join us in the annual celebration of nature, community, and our campus.&nbsp;<\/p><p class=\"wp-block-paragraph\">This grass restoration project is designed to improve the long-term health and durability of these high-traffic areas, making them more sustainable and enjoyable for years to come. We appreciate your patience.&nbsp;<\/p><p class=\"wp-block-paragraph\">If you have questions about the project, contact Director of Landscape and Grounds Holly Chichester-Morby at&nbsp;<a href=\"mailto:hchiches@umw.edu\">hchiches@umw.edu<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph LawnsOver the next several weeks, UMW Landscape and Grounds will begin improvements to two well-loved outdoor spaces: the lawn in front of Westmoreland Hall and the area between Mason and Randolph Halls, affectionately known as &ldquo;the Beach.&rdquo;Both areas require soil removal and remediation.&nbsp;&ldquo;The [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35557","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns\" \/>\n<meta property=\"og:description\" content=\"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph LawnsOver the next several weeks, UMW Landscape and Grounds will begin improvements to two well-loved outdoor spaces: the lawn in front of Westmoreland Hall and the area between Mason and Randolph Halls, affectionately known as &ldquo;the Beach.&rdquo;Both areas require soil removal and remediation.&nbsp;&ldquo;The [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-07T19:28:29+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/greener-gathering-spaces\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/greener-gathering-spaces\\\/\",\"name\":\"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2026-10-07T18:45:53+00:00\",\"dateModified\":\"2026-10-07T19:28:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/greener-gathering-spaces\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/greener-gathering-spaces\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/greener-gathering-spaces\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/","og_locale":"en_US","og_type":"article","og_title":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns","og_description":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph LawnsOver the next several weeks, UMW Landscape and Grounds will begin improvements to two well-loved outdoor spaces: the lawn in front of Westmoreland Hall and the area between Mason and Randolph Halls, affectionately known as &ldquo;the Beach.&rdquo;Both areas require soil removal and remediation.&nbsp;&ldquo;The [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/","og_site_name":"Facilities Services","article_modified_time":"2026-10-07T19:28:29+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/","name":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2026-10-07T18:45:53+00:00","dateModified":"2026-10-07T19:28:29+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/greener-gathering-spaces\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Greener Gathering Spaces for Campus with Updates for Westmoreland, Mason and Randolph Lawns"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35557","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35557"}],"version-history":[{"count":1,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35557\/revisions"}],"predecessor-version":[{"id":35558,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35557\/revisions\/35558"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35544,"date":"2026-08-21T09:02:01","date_gmt":"2026-08-21T13:02:01","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35544"},"modified":"2026-08-21T09:02:01","modified_gmt":"2026-08-21T13:02:01","slug":"vehicle-rules-regulations","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/","title":{"rendered":"Vehicle Rules &amp; Regulations"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media umw-hero--with-no-content\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">facilities services<\/div><h1 class=\"umw-hero__title__header\">Vehicle Rules &amp; Regulations<\/h1><\/div><\/div><\/div><\/div><\/section><h2 id=\"h-use-operation-and-maintenance\" class=\"wp-block-heading\">Use, Operation, and Maintenance<\/h2><h3 id=\"h-location-of-pool-vehicles\" class=\"wp-block-heading\">Location of Pool Vehicles<\/h3><p class=\"wp-block-paragraph\">UMW pool vehicles are located at the Physical Plant building off of Hanover Street, behind the Battleground Athletic Complex and home to UMW Facilities Operations. Administration staff members process all requests for use of vehicles.<\/p><h3 id=\"h-who-may-reserve-and-drive-pool-vehicles\" class=\"wp-block-heading\">Who May Reserve and Drive Pool Vehicles<\/h3><p class=\"wp-block-paragraph\">All UMW students and staff members are eligible to use pool vehicles. The operator must possess a valid driver&rsquo;s license. A faculty or staff member MUST accompany any student using the vehicles beyond a 200-mile radius. Trips outside the 200-mile radius require approval by the Office of Student Activities and Engagement. A travel plan, roster of all students traveling (including emergency contact information), and supporting documentation is required in order to travel. This information should be submitted to SAE, with each student filling out the &ldquo;Student Travel Emergency Contact Form and Conference Waiver.&rdquo; All overnight trips require approval, with SAE having the right to request a <strong>mandatory <\/strong>chaperone. All student trips without a chaperone should identify a faculty or staff member who will be a point of contact for them during their trip. All UMW students on a trip are expected to abide by the behavior expectations outlined in UMW&rsquo;s Student Handbook and the Office of Student involvement&rsquo;s travel policies. The University recommends limited driving from midnight to 5am. Student driving shifts should be no longer than 3.5 hours.<\/p><h3 id=\"h-how-to-reserve-a-pool-van\" class=\"wp-block-heading\">How to Reserve a Pool Van<\/h3><p class=\"wp-block-paragraph\">All vehicles are booked on a first come, first served basis, with a minimum advance notice of five (5) days.<\/p><p class=\"wp-block-paragraph\"><a href=\"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/\">Requesting a State Vehicle<\/a><\/p><p class=\"wp-block-paragraph\">All requested information must be supplied. Omitted information may result in denial or delay of service; fields marked &ldquo;TBA&rdquo; or &ldquo;TBD&rdquo; will not be accepted. The person reserving a vehicle must give the date and time which he or she intends to use and return the vehicle and must identify the driver of each vehicle. All vehicles are in great demand, so it is important the operator return the vehicle on time.<br>The driver should <strong>perform an inspection of the vehicle upon receipt<\/strong>, listing any defects on the mileage sheet before departure. The mileage sheet is provided in the packet with the key. Prior to returning the vehicle, the driver should repeat the process of inspection, noting any new damage on the mileage sheet. The sponsoring department and driver are responsible for returning the vehicle in the condition in which they received it&ndash;in an identical level of cleanliness, free of defects or damage.<\/p><h3 id=\"h-how-to-pick-up-and-return-a-pool-vehicle\" class=\"wp-block-heading\">How to Pick Up and Return a Pool Vehicle<\/h3><p class=\"wp-block-paragraph\">To pick up a UMW vehicle scheduled to depart during the normal business hours of 8 a.m. to 5 p.m., one must report to Facilities Services shortly before departure time, but no later than 4:30 p.m. on the day of departure for vehicles scheduled to depart after business hours and on Friday, Saturday or Sunday. One must report to Facilities Services <strong>no later than 4:30 p.m. Friday<\/strong>. In most cases, drivers will be issued a vehicle packet containing keys and report forms, and they will be instructed to return for the vehicle at the time and\/or date of departure. The vehicle will be located just outside the locked gate at the east end of the Physical Plant.<br>During the normal work hours of 8 a.m. to 5 p.m. (weekdays), the pool vehicle may be returned to the Physical Plant compound. The operator must complete the Vehicle Use Report and return it, with the keys and checkout package, to the front desk. If the operator arrives after normal hours, the pool vehicle must still be returned to the Physical Plant building and the packet must be <strong>dropped into the lock box mounted on the wall at the front door<\/strong>.<\/p><h3 id=\"h-using-a-pool-vehicle\" class=\"wp-block-heading\">Using a Pool Vehicle<\/h3><p class=\"wp-block-paragraph\">The operator of the pool vehicle is not only subject to Virginia traffic laws, but also to UMW rules and regulations. Driving with courtesy and consideration for the public is of the utmost importance.<br>The operator of a pool vehicle must remember that the state pool vehicle attracts attention and may leave favorable or unfavorable impression, depending on the behavior of the driver and passengers. These impressions reflect on UMW and on the state.<br>Vans in the vehicle pool have an occupancy limit of (12) people, (11) plus the driver.<\/p><h3 id=\"h-what-to-do-in-the-event-of-mechanical-trouble\" class=\"wp-block-heading\">What to do in the Event of Mechanical Trouble<\/h3><p class=\"wp-block-paragraph\">All pool vehicles are service and ready to be used as scheduled. However, if the vehicle breaks down and requires assistance, please call the Vehicle Management Control Center (VMCC Program) at 1-866-857-6866. Detailed instruction are located in each vehicle.<\/p><h3 id=\"h-purchase-of-fuel\" class=\"wp-block-heading\">Purchase of Fuel<\/h3><p class=\"wp-block-paragraph\">When a vehicle requires fuel outside of Facilities Services&rsquo; normal business hours, gas may be obtained from stations that participate in the Voyager Fuel Card program. A station listing and instructions on how to use the card is located in each vehicle.<\/p><h3 id=\"h-in-the-event-of-an-accident\" class=\"wp-block-heading\">In the Event of an Accident<\/h3><ul class=\"wp-block-list\">\n<li>Call the Police\n<ul class=\"wp-block-list\">\n<li>At UMW main campus, contact the University Police 540-654-1025.<\/li>\n\n\n\n<li>In Virginia, call the State Police.<\/li>\n\n\n\n<li>Outside of Virginia, contact the police in your current jurisdiction.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Additional Reporting\n<ul class=\"wp-block-list\">\n<li>Contact rental car company (if driving a rental car).<\/li>\n\n\n\n<li>Contact University Risk Management 540-654-1018 (after hours contact UMW University Police).<\/li>\n\n\n\n<li>Contact Facilities Operations at 540-654-1047 (if driving a state vehicle).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>General Information\n<ul class=\"wp-block-list\">\n<li><strong>Do not<\/strong> admit fault.<\/li>\n\n\n\n<li><strong>Do not <\/strong>comment about the accident to anyone but the police and insurance company.<\/li>\n\n\n\n<li>Gather Information:\n<ul class=\"wp-block-list\">\n<li>Driver&rsquo;s information (name, address, contact number) &amp; number of passengers<\/li>\n\n\n\n<li>Witness information (same as above)<\/li>\n\n\n\n<li>Injured parties&rsquo; information (if any, same as above)<\/li>\n\n\n\n<li>Police information (same as above, including badge number)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Gather Evidence\n<ul class=\"wp-block-list\">\n<li>Photographic evidence (use cell phone for pictures)\n<ul class=\"wp-block-list\">\n<li>Property damage<\/li>\n\n\n\n<li>Physical layout of the scene<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>The vehicle is insured by<\/strong>: The Commonwealth of Virginia<\/li>\n<\/ul><h3 id=\"h-emergency-equipment\" class=\"wp-block-heading\">Emergency Equipment<\/h3><p class=\"wp-block-paragraph\">All vehicles ate equipped with a spare tire, flares, fire extinguisher, flashlight, and first aid kit.<\/p><h3 id=\"h-securing-the-vehicle\" class=\"wp-block-heading\">Securing the Vehicle<\/h3><p class=\"wp-block-paragraph\">Vehicles must be locked when unattended and the key should remain with the individual who checked it out. The Voyager card must be secured and remain with the vehicle at all times. If the card is lost or stolen it must be reported immediately to Facilities Operations and the UMW Police Department. If the card is not properly reported as lost or stolen and fraudulent charges appear on the statement, your department may be liable.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Use, Operation, and MaintenanceLocation of Pool VehiclesUMW pool vehicles are located at the Physical Plant building off of Hanover Street, behind the Battleground Athletic Complex and home to UMW Facilities Operations. Administration staff members process all requests for use of vehicles.Who May Reserve and Drive Pool VehiclesAll UMW students and staff members are eligible to [&hellip;]<\/p>\n","protected":false},"author":29891,"featured_media":0,"parent":14587,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35544","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vehicle Rules &amp; Regulations - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vehicle Rules &amp; Regulations\" \/>\n<meta property=\"og:description\" content=\"Use, Operation, and MaintenanceLocation of Pool VehiclesUMW pool vehicles are located at the Physical Plant building off of Hanover Street, behind the Battleground Athletic Complex and home to UMW Facilities Operations. Administration staff members process all requests for use of vehicles.Who May Reserve and Drive Pool VehiclesAll UMW students and staff members are eligible to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/vehicle-rules-regulations\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/vehicle-rules-regulations\\\/\",\"name\":\"Vehicle Rules &amp; Regulations - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2026-08-21T13:02:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/vehicle-rules-regulations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/vehicle-rules-regulations\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/vehicle-rules-regulations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Requesting a State Vehicle\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Vehicle Use Guidelines\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/requesting-a-state-vehicle\\\/vehicle-use-policy\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Vehicle Rules &amp; Regulations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vehicle Rules &amp; Regulations - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/","og_locale":"en_US","og_type":"article","og_title":"Vehicle Rules &amp; Regulations","og_description":"Use, Operation, and MaintenanceLocation of Pool VehiclesUMW pool vehicles are located at the Physical Plant building off of Hanover Street, behind the Battleground Athletic Complex and home to UMW Facilities Operations. Administration staff members process all requests for use of vehicles.Who May Reserve and Drive Pool VehiclesAll UMW students and staff members are eligible to [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/","og_site_name":"Facilities Services","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/","name":"Vehicle Rules &amp; Regulations - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2026-08-21T13:02:01+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/vehicle-rules-regulations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Requesting a State Vehicle","item":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/"},{"@type":"ListItem","position":3,"name":"Vehicle Use Guidelines","item":"https:\/\/adminfinance.umw.edu\/facilities\/requesting-a-state-vehicle\/vehicle-use-policy\/"},{"@type":"ListItem","position":4,"name":"Vehicle Rules &amp; Regulations"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29891"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35544"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35544\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/14587"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35433,"date":"2026-07-02T14:46:14","date_gmt":"2026-07-02T18:46:14","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35433"},"modified":"2026-07-27T11:17:34","modified_gmt":"2026-07-27T15:17:34","slug":"george-washington-hall-roof-replacement","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/","title":{"rendered":"George Washington Hall Roof Replacement"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">George Washington Hall<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-intro-text alignfull\"><div class=\"umw-hero__content\"><div class=\"container\"><div class=\"umw-hero__content__copy\">\n<div class=\"wp-block-umw-intro-text umw-intro-text\"><div class=\"umw-intro-text__inner\">\n<h2 id=\"h-\" class=\"wp-block-heading umw-intro-title\"><\/h2>\n\n\n\n<p class=\"has-text-align-left umw-intro-content wp-block-paragraph\"><\/p>\n<\/div><\/div>\n<\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-george-washington-hall-roof-replacement\" class=\"wp-block-heading\">George Washington Hall Roof Replacement<\/h2><p class=\"wp-block-paragraph\"><strong>The roof replacement project for George Washington Hall begins at the end of June, and the building will be closed for the initial phase as the existing roof is removed, Monday, June 29 through Friday, July 10.<\/strong><\/p><p class=\"wp-block-paragraph\">Offices in GW Hall will need to work elsewhere during this two-week period, and building occupants should make other arrangements for meeting locations and office spaces. Employees in GW Hall should work with their supervisors to determine the best options, which include working remotely or scheduling time in other spaces on campus.<\/p><p class=\"wp-block-paragraph\">Please call or email in advance to schedule any appointments with offices that have relocated from GW Hall through July 10. If you need to access spaces in GW Hall temporarily between June 29 and July 10 to retrieve any items, please contact Senior Director of Capital Outlay <a href=\"mailto:egilliki@umw.edu\">Ed Gillikin<\/a> at 654-1292 to make arrangements in advance. The building may be locked and will be unavailable for offices, meetings spaces, visitors or other uses. Dodd Auditorium is also offline during this two-week period, June 29-July 10.<\/p><p class=\"wp-block-paragraph\">Once the first phase of the roof replacement is complete, GW Hall will reopen Monday, July 13, through later stages of the project, which continues through August 28. Building occupants will be notified of any intermittent closures needed. Part of the GW parking lot may be used for materials storage and roof access, so please be mindful of any temporary changes to parking adjacent to the building.&nbsp;<\/p><p class=\"wp-block-paragraph\">We appreciate your patience and understanding to keep the roof work site safe and contained.&nbsp;<\/p><p class=\"wp-block-paragraph\">For any questions, contact AVP for Facilities Operations and Capital Outlay <a href=\"mailto:bgorham@umw.edu\">Brian Gorham<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>George Washington Hall Roof ReplacementThe roof replacement project for George Washington Hall begins at the end of June, and the building will be closed for the initial phase as the existing roof is removed, Monday, June 29 through Friday, July 10.Offices in GW Hall will need to work elsewhere during this two-week period, and building [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35433","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>George Washington Hall Roof Replacement - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"George Washington Hall Roof Replacement\" \/>\n<meta property=\"og:description\" content=\"George Washington Hall Roof ReplacementThe roof replacement project for George Washington Hall begins at the end of June, and the building will be closed for the initial phase as the existing roof is removed, Monday, June 29 through Friday, July 10.Offices in GW Hall will need to work elsewhere during this two-week period, and building [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:17:34+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/george-washington-hall-roof-replacement\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/george-washington-hall-roof-replacement\\\/\",\"name\":\"George Washington Hall Roof Replacement - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2026-07-02T18:46:14+00:00\",\"dateModified\":\"2026-07-27T15:17:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/george-washington-hall-roof-replacement\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/george-washington-hall-roof-replacement\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/george-washington-hall-roof-replacement\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"George Washington Hall Roof Replacement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"George Washington Hall Roof Replacement - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/","og_locale":"en_US","og_type":"article","og_title":"George Washington Hall Roof Replacement","og_description":"George Washington Hall Roof ReplacementThe roof replacement project for George Washington Hall begins at the end of June, and the building will be closed for the initial phase as the existing roof is removed, Monday, June 29 through Friday, July 10.Offices in GW Hall will need to work elsewhere during this two-week period, and building [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:17:34+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/","name":"George Washington Hall Roof Replacement - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2026-07-02T18:46:14+00:00","dateModified":"2026-07-27T15:17:34+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/george-washington-hall-roof-replacement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"George Washington Hall Roof Replacement"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35433"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35433\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":27610,"date":"2026-06-11T09:58:54","date_gmt":"2026-06-11T13:58:54","guid":{"rendered":"http:\/\/www.umw.edu\/recycle\/default.php"},"modified":"2026-06-11T17:39:02","modified_gmt":"2026-06-11T21:39:02","slug":"recycling-at-umw","status":"publish","type":"page","link":"http:\/\/sustainability.umw.edu\/recycling","title":{"rendered":"Recycling at UMW"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"image-gallery layout__block\">\n\t<div class=\"image-gallery__inner\">\n\t\t<div class=\"container\">\n\t\t\t<div class=\"image-gallery__slideshow\">\n\t\t\t\t<div class=\"image-gallery__slideshow__wrapper\">\n\t\t\t\t\t<div class=\"image-gallery__slideshow__main\">\n\t\t\t\t\t<div class=\"image-gallery__slideshow__main__track\" js-slideshow-track=\"true\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__slide\" js-slide=\"true\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-main\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"663\" data-id=\"35427\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Know-Your-Recycling.jpg\" alt=\"Know Your No's - know what to recycle graphic\" class=\"wp-image-35427\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Know-Your-Recycling.jpg 1024w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Know-Your-Recycling-300x194.jpg 300w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Know-Your-Recycling-768x497.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__slide\" js-slide=\"true\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-main\"><img loading=\"lazy\" decoding=\"async\" width=\"1131\" height=\"772\" data-id=\"35100\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1-1131x772.jpg\" alt=\"A UMW Recycling bin with our recycling stickers on the lid\" class=\"wp-image-35100\"><\/figure>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__slide\" js-slide=\"true\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-main\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"700\" data-id=\"35429\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100.jpg\" alt=\"UMW Recycles sticker with Recycling symbol\" class=\"wp-image-35429\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100.jpg 700w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100-300x300.jpg 300w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100-150x150.jpg 150w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100-50x50.jpg 50w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100-75x75.jpg 75w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\"><\/figure>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__slide\" js-slide=\"true\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"792\" height=\"772\" data-id=\"35430\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Butts-are-Litter-Too_SIGN_11x17-792x772.jpg\" alt=\"Butts (cigarette) are litter, too sticker\" class=\"wp-image-35430\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Butts-are-Litter-Too_SIGN_11x17-792x772.jpg 792w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Butts-are-Litter-Too_SIGN_11x17-50x50.jpg 50w\" sizes=\"auto, (max-width: 792px) 100vw, 792px\"><\/figure>\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<button class=\"image-gallery__nav image-gallery__nav--previous\" aria-label=\"Previous\" js-prev>\n\t\t\t\t\t\t<svg width=\"24\" height=\"24\" stroke-width=\"1.5\" viewbox=\"0 0 24 24\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n<path d=\"M18.5 12H6M6 12L12 6M6 12L12 18\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path>\n<\/svg>\t\t\t\t\t<\/button>\n\t\t\t\t\t<button class=\"image-gallery__nav image-gallery__nav--next\" aria-label=\"Next\" js-next>\n\t\t\t\t\t\t<svg width=\"24\" height=\"24\" stroke-width=\"1.5\" viewbox=\"0 0 24 24\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n<path d=\"M6 12H18.5M18.5 12L12.5 6M18.5 12L12.5 18\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path>\n<\/svg>\t\t\t\t\t<\/button>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnails\" js-thumbnails-container=\"true\">\n\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnails__track\" js-thumbnail-track>\n\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"image-gallery__slideshow__thumbnail\" aria-label=\"Slide 0 thumbnail\" js-thumbnail>\n\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnail__inner\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-thumb\"><img loading=\"lazy\" decoding=\"async\" width=\"224\" height=\"116\" data-id=\"35427\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Know-Your-Recycling-224x116.jpg\" alt=\"Know Your No's - know what to recycle graphic\" class=\"wp-image-35427\"><\/figure>\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"image-gallery__slideshow__thumbnail\" aria-label=\"Slide 1 thumbnail\" js-thumbnail>\n\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnail__inner\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-thumb\"><img loading=\"lazy\" decoding=\"async\" width=\"224\" height=\"116\" data-id=\"35100\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1-224x116.jpg\" alt=\"A UMW Recycling bin with our recycling stickers on the lid\" class=\"wp-image-35100\"><\/figure>\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"image-gallery__slideshow__thumbnail\" aria-label=\"Slide 2 thumbnail\" js-thumbnail>\n\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnail__inner\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-umw-gallery-thumb\"><img loading=\"lazy\" decoding=\"async\" width=\"224\" height=\"116\" data-id=\"35429\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycles-Branded-Logo_Circle-3in-x100-224x116.jpg\" alt=\"UMW Recycles sticker with Recycling symbol\" class=\"wp-image-35429\"><\/figure>\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t\t\t\t<button class=\"image-gallery__slideshow__thumbnail\" aria-label=\"Slide 3 thumbnail\" js-thumbnail>\n\t\t\t\t\t\t\t<div class=\"image-gallery__slideshow__thumbnail__inner\">\n\t\t\t\t\t\t\t<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"224\" height=\"116\" data-id=\"35430\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/Butts-are-Litter-Too_SIGN_11x17-224x116.jpg\" alt=\"Butts (cigarette) are litter, too sticker\" class=\"wp-image-35430\"><\/figure>\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/button>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"image-gallery__pager\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__pager__section\" js-page><\/div>\n\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__pager__section\" js-page><\/div>\n\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__pager__section\" js-page><\/div>\n\t\t\t\t\t\t\t\t\t\t<div class=\"image-gallery__pager__section\" js-page><\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"image-gallery__description-container\" js-description-container>\n\t\t\t\t\t                    \t\t\t\t\t<div class=\"image-gallery__description\" js-description>\n                        \t\t\t\t\t\t<h3 class=\"image-gallery__description__header\">Know Your Recycling<\/h3>\n                                                \t\t\t\t\t<\/div>\n                    \t\t\t\t\t                    \t\t\t\t\t<div class=\"image-gallery__description\" js-description>\n                        \t\t\t\t\t\t<h3 class=\"image-gallery__description__header\">RecycleCan-stickers24-1<\/h3>\n                                                \t\t\t\t\t<\/div>\n                    \t\t\t\t\t                    \t\t\t\t\t<div class=\"image-gallery__description\" js-description>\n                        \t\t\t\t\t\t<h3 class=\"image-gallery__description__header\">UMW Recycles Branded Logo_Circle 3in x100<\/h3>\n                                                \t\t\t\t\t<\/div>\n                    \t\t\t\t\t                    \t\t\t\t\t<div class=\"image-gallery__description\" js-description>\n                        \t\t\t\t\t\t<h3 class=\"image-gallery__description__header\">Butts are Litter Too_SIGN_11x17<\/h3>\n                                                \t\t\t\t\t<\/div>\n                    \t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section><div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"590\" height=\"788\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DO.png\" alt=\"UMW Recycling Guide - Accepted items\" class=\"wp-image-35424\" style=\"width:482px;height:auto\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DO.png 590w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DO-225x300.png 225w\" sizes=\"auto, (max-width: 590px) 100vw, 590px\"><\/figure>\n<\/div><figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"585\" height=\"770\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DONT.png\" alt='UMW Recycling Guide - \"Do Not Recycle\" list' class=\"wp-image-35425\" style=\"width:496px;height:auto\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DONT.png 585w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/UMW-Recycling-Guide-DONT-228x300.png 228w\" sizes=\"auto, (max-width: 585px) 100vw, 585px\"><\/figure><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"953\" height=\"326\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/NO-food-pet-styro.png\" alt=\"Campus Stickers -NO Pet Waste, No Food Waste, No Styrofoam\" class=\"wp-image-35423\" style=\"width:672px;height:auto\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/NO-food-pet-styro.png 953w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/NO-food-pet-styro-300x103.png 300w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2026\/06\/NO-food-pet-styro-768x263.png 768w\" sizes=\"auto, (max-width: 953px) 100vw, 953px\"><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":29960,"featured_media":35100,"parent":25731,"menu_order":2,"comment_status":"open","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"http:\/\/sustainability.umw.edu\/recycling","_links_to_target":""},"class_list":["post-27610","page","type-page","status-publish","has-post-thumbnail","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Recycling at UMW - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Recycling at UMW\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T21:39:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2030\" \/>\n\t<meta property=\"og:image:height\" content=\"1973\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/\",\"name\":\"Recycling at UMW - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2024\\\/08\\\/RecycleCan-stickers24-1.jpg\",\"datePublished\":\"2026-06-11T13:58:54+00:00\",\"dateModified\":\"2026-06-11T21:39:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2024\\\/08\\\/RecycleCan-stickers24-1.jpg\",\"contentUrl\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2024\\\/08\\\/RecycleCan-stickers24-1.jpg\",\"width\":2030,\"height\":1973},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/recycling-at-umw\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"About Facilities Services\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Environmental Stewardship\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/about-facilities-services\\\/environmental-stewardship\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Recycling at UMW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Recycling at UMW - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/","og_locale":"en_US","og_type":"article","og_title":"Recycling at UMW","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/","og_site_name":"Facilities Services","article_modified_time":"2026-06-11T21:39:02+00:00","og_image":[{"width":2030,"height":1973,"url":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/","name":"Recycling at UMW - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/#primaryimage"},"image":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/#primaryimage"},"thumbnailUrl":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1.jpg","datePublished":"2026-06-11T13:58:54+00:00","dateModified":"2026-06-11T21:39:02+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/#primaryimage","url":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1.jpg","contentUrl":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2024\/08\/RecycleCan-stickers24-1.jpg","width":2030,"height":1973},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/recycling-at-umw\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"About Facilities Services","item":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/"},{"@type":"ListItem","position":3,"name":"Environmental Stewardship","item":"https:\/\/adminfinance.umw.edu\/facilities\/about-facilities-services\/environmental-stewardship\/"},{"@type":"ListItem","position":4,"name":"Recycling at UMW"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/27610","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29960"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=27610"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/27610\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/25731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media\/35100"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=27610"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35398,"date":"2025-11-18T15:57:31","date_gmt":"2025-11-18T20:57:31","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35398"},"modified":"2026-07-27T11:18:21","modified_gmt":"2026-07-27T15:18:21","slug":"weatherly-wing-roof-renovation-at-seacobeck-hall","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/","title":{"rendered":"Weatherly Wing Roof Renovation at Seacobeck Hall"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">Roof Renovation at Seacobeck Hall<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-weatherly-wing-roof-renovation-at-seacobeck-hall\" class=\"wp-block-heading\">Weatherly Wing Roof Renovation at Seacobeck Hall<\/h2><p class=\"wp-block-paragraph\"><strong>The roof work for the Weatherly Wing in Seacobeck Hall has been completed by spring break and the space will reopen for weekend scheduling.<\/strong><\/p><h3 id=\"h-about-the-project\" class=\"wp-block-heading\">About the Project<\/h3><p class=\"wp-block-paragraph\">Beginning the weekend of November 15, a contractor will be on campus to repair the roof above the Weatherly Wing in Seacobeck Hall. This work is limited to one wing of the building and will take place only on weekends and winter break to reduce the disruption to classes and other activities in the building during business hours. Seacobeck Hall is open during this roof renovation project, and the Weatherly Wing is available during the class schedule. Weekend availability will be limited during the roof repairs.&nbsp;<\/p><p class=\"wp-block-paragraph\">The project is expected to take several months through at least February. The noise from this work will be similar to other roof projects, both on campus and residential.&nbsp;<br><br>We appreciate your understanding as we repair this section of the roof in this beautiful performance space and lecture hall to keep it safe from water and other elements.<\/p><p class=\"wp-block-paragraph\">For more information about the project, contact Assistant Vice President of Facilities Operations &amp; Capital Outlay <a href=\"mailto:bgorham@umw.edu\">Brian Gorham<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Weatherly Wing Roof Renovation at Seacobeck HallThe roof work for the Weatherly Wing in Seacobeck Hall has been completed by spring break and the space will reopen for weekend scheduling.About the ProjectBeginning the weekend of November 15, a contractor will be on campus to repair the roof above the Weatherly Wing in Seacobeck Hall. This [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35398","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Weatherly Wing Roof Renovation at Seacobeck Hall - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Weatherly Wing Roof Renovation at Seacobeck Hall\" \/>\n<meta property=\"og:description\" content=\"Weatherly Wing Roof Renovation at Seacobeck HallThe roof work for the Weatherly Wing in Seacobeck Hall has been completed by spring break and the space will reopen for weekend scheduling.About the ProjectBeginning the weekend of November 15, a contractor will be on campus to repair the roof above the Weatherly Wing in Seacobeck Hall. This [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:18:21+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/weatherly-wing-roof-renovation-at-seacobeck-hall\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/weatherly-wing-roof-renovation-at-seacobeck-hall\\\/\",\"name\":\"Weatherly Wing Roof Renovation at Seacobeck Hall - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2025-11-18T20:57:31+00:00\",\"dateModified\":\"2026-07-27T15:18:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/weatherly-wing-roof-renovation-at-seacobeck-hall\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/weatherly-wing-roof-renovation-at-seacobeck-hall\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/weatherly-wing-roof-renovation-at-seacobeck-hall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Weatherly Wing Roof Renovation at Seacobeck Hall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Weatherly Wing Roof Renovation at Seacobeck Hall - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/","og_locale":"en_US","og_type":"article","og_title":"Weatherly Wing Roof Renovation at Seacobeck Hall","og_description":"Weatherly Wing Roof Renovation at Seacobeck HallThe roof work for the Weatherly Wing in Seacobeck Hall has been completed by spring break and the space will reopen for weekend scheduling.About the ProjectBeginning the weekend of November 15, a contractor will be on campus to repair the roof above the Weatherly Wing in Seacobeck Hall. This [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:18:21+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/","name":"Weatherly Wing Roof Renovation at Seacobeck Hall - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2025-11-18T20:57:31+00:00","dateModified":"2026-07-27T15:18:21+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/weatherly-wing-roof-renovation-at-seacobeck-hall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Weatherly Wing Roof Renovation at Seacobeck Hall"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35398"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35398\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35283,"date":"2025-07-15T10:46:21","date_gmt":"2025-07-15T14:46:21","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35283"},"modified":"2025-07-15T10:46:46","modified_gmt":"2025-07-15T14:46:46","slug":"campus-corner-facilities-updates-for-umw-neighbors","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","title":{"rendered":"Campus Corner &#8211; Facilities Updates for UMW Neighbors"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":-50,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","_links_to_target":""},"class_list":["post-35283","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Campus Corner - Facilities Updates for UMW Neighbors - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Campus Corner - Facilities Updates for UMW Neighbors\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-15T14:46:46+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/category\\\/campus-corner\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/category\\\/campus-corner\\\/\",\"name\":\"Campus Corner - Facilities Updates for UMW Neighbors - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2025-07-15T14:46:21+00:00\",\"dateModified\":\"2025-07-15T14:46:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/category\\\/campus-corner\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/category\\\/campus-corner\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/category\\\/campus-corner\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Campus Corner &#8211; Facilities Updates for UMW Neighbors\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Campus Corner - Facilities Updates for UMW Neighbors - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","og_locale":"en_US","og_type":"article","og_title":"Campus Corner - Facilities Updates for UMW Neighbors","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","og_site_name":"Facilities Services","article_modified_time":"2025-07-15T14:46:46+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/","name":"Campus Corner - Facilities Updates for UMW Neighbors - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2025-07-15T14:46:21+00:00","dateModified":"2025-07-15T14:46:46+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/category\/campus-corner\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Campus Corner &#8211; Facilities Updates for UMW Neighbors"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35283"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35283\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35252,"date":"2025-05-13T16:15:54","date_gmt":"2025-05-13T20:15:54","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35252"},"modified":"2026-07-27T11:13:52","modified_gmt":"2026-07-27T15:13:52","slug":"brent-house","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/","title":{"rendered":"Brent House"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">Brent House<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-brent-house\" class=\"wp-block-heading\">Brent House<\/h2><div class=\"wp-block-image\">\n<figure class=\"alignright size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-300x225.jpg\" alt=\"A photograph of Brent House, obscured partially by trees.\" class=\"wp-image-35272\" srcset=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-300x225.jpg 300w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-1024x768.jpg 1024w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-768x576.jpg 768w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-1536x1152.jpg 1536w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-1140x855.jpg 1140w, https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\"><\/figure>\n<\/div><p class=\"wp-block-paragraph\">Brent House, which has been closed and offline since the police station move in 2023, was removed in summer 2025 as part of the initial plan for the new theatre at the corner of William St. and Sunken Road. The nearly 100-year-old structure had been damaged from water intrusion, with major foundation and roof issues that made it too costly to repair. The demolition of Brent House opens the pathway to extend Campus Walk to the new theatre. Following the demolition, the site has been marked off with fencing and erosion control measures until the theatre project construction starts.<\/p><p class=\"wp-block-paragraph\"><strong>On Monday, June 30, the Brent House&nbsp;Parking&nbsp;Lot, Russell and Marshall Lots and the Marshall hill roadway will be closed for the demolition of Brent House.<\/strong>&nbsp;Site preparation activities and fencing begin June 30, and the initial stage will take place in July and August, with the site expanding to Marshall and Russell Halls at a later date&nbsp;in anticipation of theatre construction commencing in 2026. <\/p><p class=\"wp-block-paragraph\">The closure of the Marshall hill and the Marshall and Russell Lots will remain in effect indefinitely to facilitate the future demolition of Marshall and Russell Halls and site preparation for the future theatre construction. Residential student parking is available in the Alvey Deck and adjacent Sunken Road lots, as well as some spaces in the William St. lot at Sunken Road.<\/p><p class=\"wp-block-paragraph\">Parking&nbsp;for faculty and staff will remain available in all other designated faculty and staff&nbsp;lots.<\/p><p class=\"wp-block-paragraph\"><strong>Because of the closure of roadway at the Marshall hill, please be alert for traffic pattern and pedestrian path changes from the Sunken Road entrance at the Marshall\/Russell lots and the Double Drive entrance. Vehicles entering from Double Drive can circle around the Bell Tower or turn at the George Washington lot.&nbsp;<\/strong><\/p><p class=\"wp-block-paragraph\">For a list view of parking&nbsp;locations please see the&nbsp;<a href=\"https:\/\/adminfinance.umw.edu\/parking\/lot-designation\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lot Designation Page<\/a>&nbsp;on the Parking&nbsp;Management website.&nbsp; &nbsp;<\/p><h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2><h3 class=\"wp-block-heading\">What demolition and construction will happen at the Brent House site?<\/h3><p class=\"wp-block-paragraph\">Once Brent House has been removed the site will be graded for the upcoming construction on the new theatre. Campus Walk will be extended to the corner of campus, via an accessible and scenic path, which once complete with the theatre construction will be open to the public to enjoy walking through campus. During construction, the area will only be open to construction traffic.<\/p><h3 class=\"wp-block-heading\">How long will the project take?<\/h3><p class=\"wp-block-paragraph\">The initial stage of demolition will take several weeks, with sitework through the semester. Then next phase of the multiyear project begins at Marshall and Russell Halls as those buildings will also be removed.<\/p><p class=\"wp-block-paragraph\">Site preparation activities and fencing begin June 30, and the initial stage will take place in July and August, with the site expanding to Marshall and Russell Halls at a later date&nbsp;in anticipation of theatre construction commencing in 2026. The demolition of Brent House is scheduled to be completed by August 20, 2025.&nbsp;<\/p><h3 class=\"wp-block-heading\">Can I use the Double Drive through the Marshall hill during construction?<\/h3><p class=\"wp-block-paragraph\">No, the road at Marshall hill will be closed to thru traffic as construction starts. The parking lot at Randolph Hall remains open at the start of the project, but may have some impact or delays for construction traffic.<\/p><h3 class=\"wp-block-heading\">Are the Marshall and Russell parking lots open during construction?<\/h3><p class=\"wp-block-paragraph\"><strong>On Monday, June 30, 2025, the Brent House&nbsp;Parking&nbsp;Lot, Russell and Marshall Lots and the Marshall hill roadway will be closed for the demolition of Brent House.<\/strong>&nbsp;<\/p><p class=\"wp-block-paragraph\">The Marshall and Russell parking lots will be closed to faculty, staff, students and the general public for the duration of the construction project, as it will be the primary lot for construction activities. <\/p><p class=\"wp-block-paragraph\">Any special uses of the lots, such as move-in parking, will be announced.<\/p><h3 class=\"wp-block-heading\">How will the project impact traffic?<\/h3><p class=\"wp-block-paragraph\">The corner of campus at William St. and Sunken Road will have some construction traffic as trucks and equipment access the site. Vehicles will be staged in the Marshall and Russell lots, along with the William St. lot, as needed to reduce the time parked on Sunken Road. Both Sunken Road and Marshall hill road at Double Drive will be used as construction access points.<\/p><h3 class=\"wp-block-heading\">What are the construction hours for the new theatre project?<\/h3><p class=\"wp-block-paragraph\">Weekday work will take place during general business hours, with the contractor arriving on site at 7 a.m. and typically wrapping up by 5 p.m. We&rsquo;ll follow the city noise ordinance and note any special events on campus or in the neighborhoods which may be impacted by particular work, depending on the stage of the project.<\/p><p class=\"wp-block-paragraph\">Noise, dust and disruptions will be mitigated, but should also be expected.<\/p><p class=\"wp-block-paragraph\">For more information on theatre construction, <a href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/new-theatre-project\/\">visit the new theatre project page<\/a>. <\/p><h3 class=\"wp-block-heading\">What&rsquo;s happening with the trees around the construction site for the new theatre?<\/h3><p class=\"wp-block-paragraph\">We are working with the Department of Forestry on tree removal for the site, with regular updates to Tree Fredericksburg. While we will be removing several trees at one time, it will ready the site through grading for the extension of Campus Walk.<\/p><p class=\"wp-block-paragraph\">Several tree species will be saved for reuse. We are working with local vendors on options for using the wood from trees for upcoming projects on campus and in the Fredericksburg region.<\/p><p class=\"wp-block-paragraph\">We also have a full landscaping plan for the new theatre, creating a backdrop for the building and a gathering area at that corner of campus. Additional native trees, shrubs, flowers and grasses will complete the project.<\/p><h3 class=\"wp-block-heading\">What&rsquo;s in place for stormwater management?<\/h3><p class=\"wp-block-paragraph\">We have erosion and sediment controls to prevent unobstructed flow of waters into the city&rsquo;s stormwater system, along with measures to capture construction debris on site. We are working closely with the city on details for the project.<\/p><h3 class=\"wp-block-heading\">What&rsquo;s being saved from Brent House?<\/h3><p class=\"wp-block-paragraph\">UMW&rsquo;s Department of Historic Preservation has reviewed the property and identified key elements to be preserved by the University. Several elements will be housed in Advancement &amp; Alumni Engagement as part of their collection. Alumni also have an opportunity to reserve a brick from the <a href=\"http:\/\/alumni.umw.edu\/bricks\">Office of Alumni Engagement<\/a><\/p><p class=\"wp-block-paragraph\">When the police moved from the building, significant items were also relocated or saved.<\/p><p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Brent HouseBrent House, which has been closed and offline since the police station move in 2023, was removed in summer 2025 as part of the initial plan for the new theatre at the corner of William St. and Sunken Road. The nearly 100-year-old structure had been damaged from water intrusion, with major foundation and roof [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35252","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Brent House - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brent House\" \/>\n<meta property=\"og:description\" content=\"Brent HouseBrent House, which has been closed and offline since the police station move in 2023, was removed in summer 2025 as part of the initial plan for the new theatre at the corner of William St. and Sunken Road. The nearly 100-year-old structure had been damaged from water intrusion, with major foundation and roof [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:13:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/\",\"name\":\"Brent House - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2025\\\/07\\\/Brent-House-2025-300x225.jpg\",\"datePublished\":\"2025-05-13T20:15:54+00:00\",\"dateModified\":\"2026-07-27T15:13:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2025\\\/07\\\/Brent-House-2025.jpg\",\"contentUrl\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/files\\\/2025\\\/07\\\/Brent-House-2025.jpg\",\"width\":2048,\"height\":1536},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/brent-house\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Brent House\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Brent House - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/","og_locale":"en_US","og_type":"article","og_title":"Brent House","og_description":"Brent HouseBrent House, which has been closed and offline since the police station move in 2023, was removed in summer 2025 as part of the initial plan for the new theatre at the corner of William St. and Sunken Road. The nearly 100-year-old structure had been damaged from water intrusion, with major foundation and roof [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:13:52+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/","name":"Brent House - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/#primaryimage"},"image":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/#primaryimage"},"thumbnailUrl":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025-300x225.jpg","datePublished":"2025-05-13T20:15:54+00:00","dateModified":"2026-07-27T15:13:52+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/#primaryimage","url":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025.jpg","contentUrl":"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/07\/Brent-House-2025.jpg","width":2048,"height":1536},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/brent-house\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Brent House"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35252"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35252\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35250,"date":"2025-05-13T16:15:00","date_gmt":"2025-05-13T20:15:00","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35250"},"modified":"2026-07-27T11:22:47","modified_gmt":"2026-07-27T15:22:47","slug":"utility-repairs","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/","title":{"rendered":"Utility Repairs"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">Utility Repairs<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-utility-repairs\" class=\"wp-block-heading\">Utility Repairs<\/h2><p class=\"wp-block-paragraph\">In Summer 2025, we replaced the heat exchanger in Randolph Hall. We also completed critical HVAC equipment replacement projects throughout campus, including new window AC units throughout Jefferson Hall. A special thanks to our Housekeeping staff for their work throughout the summer to turnover residence rooms for summer events, intern housing and camps.<\/p><p class=\"wp-block-paragraph\">Following the completion of the new waterline between Seacobeck and Woodard Halls this summer, we&rsquo;ll start a stream restoration project adjacent to the building this fall. The project will stabilize the banks of the stream and prevent water erosion, as well as further preserve the Woodard walkway. It will also include native plants streamside plantings.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Utility RepairsIn Summer 2025, we replaced the heat exchanger in Randolph Hall. We also completed critical HVAC equipment replacement projects throughout campus, including new window AC units throughout Jefferson Hall. A special thanks to our Housekeeping staff for their work throughout the summer to turnover residence rooms for summer events, intern housing and camps.Following the [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":1000,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35250","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Utility Repairs - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Utility Repairs\" \/>\n<meta property=\"og:description\" content=\"Utility RepairsIn Summer 2025, we replaced the heat exchanger in Randolph Hall. We also completed critical HVAC equipment replacement projects throughout campus, including new window AC units throughout Jefferson Hall. A special thanks to our Housekeeping staff for their work throughout the summer to turnover residence rooms for summer events, intern housing and camps.Following the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:22:47+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/utility-repairs\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/utility-repairs\\\/\",\"name\":\"Utility Repairs - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2025-05-13T20:15:00+00:00\",\"dateModified\":\"2026-07-27T15:22:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/utility-repairs\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/utility-repairs\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/utility-repairs\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Utility Repairs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Utility Repairs - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/","og_locale":"en_US","og_type":"article","og_title":"Utility Repairs","og_description":"Utility RepairsIn Summer 2025, we replaced the heat exchanger in Randolph Hall. We also completed critical HVAC equipment replacement projects throughout campus, including new window AC units throughout Jefferson Hall. A special thanks to our Housekeeping staff for their work throughout the summer to turnover residence rooms for summer events, intern housing and camps.Following the [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:22:47+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/","name":"Utility Repairs - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2025-05-13T20:15:00+00:00","dateModified":"2026-07-27T15:22:47+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/utility-repairs\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Utility Repairs"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35250"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35250\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35249,"date":"2025-05-13T16:13:28","date_gmt":"2025-05-13T20:13:28","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35249"},"modified":"2026-07-27T11:12:37","modified_gmt":"2026-07-27T15:12:37","slug":"ball-hall","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/","title":{"rendered":"Ball Hall"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\">Facilities Services<\/div><h1 class=\"umw-hero__title__header\">Ball Hall<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-ball-hall\" class=\"wp-block-heading\">Ball Hall<\/h2><p class=\"wp-block-paragraph\">Ball Hall is offline in 2025-26 for accessibility improvements including the addition of an elevator (to be completed in 2027) and room updates to the first floor to make several suites accessible. The work is scheduled to be completed in Fall 2026, and until then Bushnell Hall will be the all-female residence hall.<\/p><p class=\"wp-block-paragraph\">In addition, potential water and sewer lines replacement may be conducted, including renovations to the bathrooms in the residence hall. Work is currently pending approval as to not conflict with other permitted project activities. Occasional debris removal or deliveries may occur around the work area and across Campus Walk, with minimal disruptions.<\/p><p class=\"wp-block-paragraph\"><strong>Please note that the&nbsp;Fairfax&nbsp;Lot&nbsp;will be closed over winter break so that materials can be moved on site.<\/strong>&nbsp;This&nbsp;lot&nbsp;will remain closed until fall 2026. Paths around this area will have a detour, and supplemental trash and recycling bins will be located at Custis and Madison&nbsp;Halls during the&nbsp;Ball&nbsp;Hall&nbsp;construction project.<\/p><p class=\"wp-block-paragraph\">Contractors may unload in the Fairfax Parking Lot.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ball HallBall Hall is offline in 2025-26 for accessibility improvements including the addition of an elevator (to be completed in 2027) and room updates to the first floor to make several suites accessible. The work is scheduled to be completed in Fall 2026, and until then Bushnell Hall will be the all-female residence hall.In addition, [&hellip;]<\/p>\n","protected":false},"author":29877,"featured_media":0,"parent":34250,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35249","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ball Hall - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ball Hall\" \/>\n<meta property=\"og:description\" content=\"Ball HallBall Hall is offline in 2025-26 for accessibility improvements including the addition of an elevator (to be completed in 2027) and room updates to the first floor to make several suites accessible. The work is scheduled to be completed in Fall 2026, and until then Bushnell Hall will be the all-female residence hall.In addition, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:12:37+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/ball-hall\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/ball-hall\\\/\",\"name\":\"Ball Hall - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2025-05-13T20:13:28+00:00\",\"dateModified\":\"2026-07-27T15:12:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/ball-hall\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/ball-hall\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/ball-hall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Campus Construction\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/campus-construction\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Ball Hall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ball Hall - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/","og_locale":"en_US","og_type":"article","og_title":"Ball Hall","og_description":"Ball HallBall Hall is offline in 2025-26 for accessibility improvements including the addition of an elevator (to be completed in 2027) and room updates to the first floor to make several suites accessible. The work is scheduled to be completed in Fall 2026, and until then Bushnell Hall will be the all-female residence hall.In addition, [&hellip;]","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:12:37+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/","name":"Ball Hall - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2025-05-13T20:13:28+00:00","dateModified":"2026-07-27T15:12:37+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/ball-hall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Campus Construction","item":"https:\/\/adminfinance.umw.edu\/facilities\/campus-construction\/"},{"@type":"ListItem","position":3,"name":"Ball Hall"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/29877"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35249"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35249\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34250"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}},{"id":35234,"date":"2025-03-31T08:11:32","date_gmt":"2025-03-31T12:11:32","guid":{"rendered":"https:\/\/adminfinance.umw.edu\/facilities\/?page_id=35234"},"modified":"2026-07-27T11:25:16","modified_gmt":"2026-07-27T15:25:16","slug":"proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed","status":"publish","type":"page","link":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/","title":{"rendered":"Tidal Freshwater Rappahannock River Watershed"},"content":{"rendered":"<?xml encoding=\"utf-8\" ?><section class=\"wp-block-umw-hero alignfull umw-custom-block umw-hero umw-hero--dark-text umw-hero--media-float-right umw-hero--white umw-hero--with-no-media\"><div class=\"umw-hero__inner\"><div class=\"umw-hero__media\"><\/div><div class=\"umw-hero__title\"><div class=\"container\"><div class=\"umw-hero__title__wrapper\"><div class=\"umw-hero__eyebrow\"><strong>facilities services<\/strong><\/div><h1 class=\"umw-hero__title__header\">Tidal Freshwater Rappahannock River Watershed<\/h1><\/div><\/div><\/div><\/div>\n<div class=\"wp-block-umw-hero-ctas alignfull\"><div class=\"umw-hero__links\"><div class=\"container\"><div class=\"umw-hero__links__wrapper\">\n\n\n\n<\/div><\/div><\/div><\/div>\n<\/section><h2 id=\"h-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\" class=\"wp-block-heading\">Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River Watershed<\/h2><p class=\"wp-block-paragraph\"><a href=\"https:\/\/adminfinance.umw.edu\/facilities\/files\/2025\/04\/Local-TMDL-Action-Plan-UMW-3.26.2025-FINAL.pdf\">Local TMDL Action Plan &ndash; UMW<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River WatershedLocal TMDL Action Plan &ndash; UMW<\/p>\n","protected":false},"author":5451,"featured_media":0,"parent":34176,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"umw_cb_additional_links":[[]],"_advisory_expires_time":"","_advisory_meta_include":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-35234","page","type-page","status-publish","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.6 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tidal Freshwater Rappahannock River Watershed - Facilities Services<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tidal Freshwater Rappahannock River Watershed\" \/>\n<meta property=\"og:description\" content=\"Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River WatershedLocal TMDL Action Plan &ndash; UMW\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/\" \/>\n<meta property=\"og:site_name\" content=\"Facilities Services\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T15:25:16+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\\\/\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\\\/\",\"name\":\"Tidal Freshwater Rappahannock River Watershed - Facilities Services\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\"},\"datePublished\":\"2025-03-31T12:11:32+00:00\",\"dateModified\":\"2026-07-27T15:25:16+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Storm Water Management \\\/ MS4 Program\",\"item\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/storm-water-management-ms4-program\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River Watershed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/#website\",\"url\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/\",\"name\":\"Facilities Services\",\"description\":\"University of Mary Washington\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adminfinance.umw.edu\\\/facilities\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tidal Freshwater Rappahannock River Watershed - Facilities Services","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/","og_locale":"en_US","og_type":"article","og_title":"Tidal Freshwater Rappahannock River Watershed","og_description":"Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River WatershedLocal TMDL Action Plan &ndash; UMW","og_url":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/","og_site_name":"Facilities Services","article_modified_time":"2026-07-27T15:25:16+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/","url":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/","name":"Tidal Freshwater Rappahannock River Watershed - Facilities Services","isPartOf":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website"},"datePublished":"2025-03-31T12:11:32+00:00","dateModified":"2026-07-27T15:25:16+00:00","breadcrumb":{"@id":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/proposed-local-bacteria-tmdl-action-plan-for-the-tidal-freshwater-rappahannock-river-watershed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/adminfinance.umw.edu\/facilities\/"},{"@type":"ListItem","position":2,"name":"Storm Water Management \/ MS4 Program","item":"https:\/\/adminfinance.umw.edu\/facilities\/storm-water-management-ms4-program\/"},{"@type":"ListItem","position":3,"name":"Local (Bacteria) TMDL Action Plan For the Tidal Freshwater Rappahannock River Watershed"}]},{"@type":"WebSite","@id":"https:\/\/adminfinance.umw.edu\/facilities\/#website","url":"https:\/\/adminfinance.umw.edu\/facilities\/","name":"Facilities Services","description":"University of Mary Washington","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adminfinance.umw.edu\/facilities\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/users\/5451"}],"replies":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/comments?post=35234"}],"version-history":[{"count":0,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/35234\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/pages\/34176"}],"wp:attachment":[{"href":"https:\/\/adminfinance.umw.edu\/facilities\/wp-json\/wp\/v2\/media?parent=35234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}]