UMW Apartments

First Priority:

Priority I Level responsibilities shall be maintained continuously until the end of the snow/ice event.

  • All driveways, including the William Street Lot and all entrances and exits to William Street, College Avenue and Sunken Road.
  • Front entrances and front steps (parking lot side) of all buildings, including the Club House and maintenance buildings
  • All sidewalks except interior courtyard walks
  • Rear entrance and connection walks from 1104B to 1106
  • William Street sidewalk from the William Street vehicular entrance to the corner of William Street and College Avenue.
  • William Street sidewalk from the William Street vehicular exit to the corner of William Street and Sunken Road.
  • Corner of William Street and Sunken Road to William Street Lot

Third Priority:

(Priority III Level responsibilities must be cleared as soon as practical not to exceed 24 hours after the end of the snow/ice event.)

  • Interior courtyard sidewalks and entrances
  • Dumpster access
  • Emergency exit areas
  • Drop inlets, drains, hydrants

Forth Priority:

(Priority IV Level responsibilities shall be done at a time to be scheduled after the completion of the snow/ice event.)

  • Parking Lot Spaces