Dahlgren Campus

Dahlgren Campus Snow and Ice Management Plan:

 

First Priority:

(Priority I Level responsibilities shall be maintained continuously until the end of the snow/ice event.)

Emergency vehicle access – A minimum of a single lane from the entrance to the Campus to the parking lot area adjacent to the main entrance of the building and the service road.

Second Priority:

(Priority II Level responsibilities shall be cleared by 7:30 a.m.  Monday through Friday, these areas will be maintained until 10:30 p.m.  Snow removal and ice management will be done in order of the following priorities.)

Roadway from the Campus entrance to the parking lots and to the main entrance of the building and service area at the side of the building

Parking Lots

Main sidewalk to main entrance

Clear pedestrian access at handicap parking spaces in parking lots allowing good footing from vehicles to the sidewalk

Third Priority:

(Priority III Level responsibilities must be cleared by 3 PM, after priority II areas are completed.)

Main sidewalk from Service Area  leading to the main building entrance

Service Area entrance and sidewalk

Forth Priority:

(Priority IV responsibilities must be cleared as soon as practical or as directed, not to exceed 24 hours after the end of the snow/ice event.)

Secondary sidewalk along entrance road

Dumpster access

Emergency exit areas

Drop inlets, drains, hydrants