Dahlgren Campus Snow and Ice Management Plan
First Priority:
(Priority I Level responsibilities shall be maintained continuously until the end of the snow/ice event.)
- Emergency vehicle access – A minimum of a single lane from the entrance to the Campus to the parking lot area adjacent to the main entrance of the building and the service road.
Second Priority:
(Priority II Level responsibilities shall be cleared by 7:30 a.m. Monday through Friday, these areas will be maintained until 10:30 p.m. Snow removal and ice management will be done in order of the following priorities.)
- Roadway from the Campus entrance to the parking lots and to the main entrance of the building and service area at the side of the building
- Parking Lots
- Main sidewalk to main entrance
- Clear pedestrian access at handicap parking spaces in parking lots allowing good footing from vehicles to the sidewalk
Third Priority:
(Priority III Level responsibilities must be cleared by 3 PM, after priority II areas are completed.)
- Main sidewalk from Service Area leading to the main building entrance
- Service Area entrance and sidewalk
Fourth Priority:
(Priority IV responsibilities must be cleared as soon as practical or as directed, not to exceed 24 hours after the end of the snow/ice event.)
- Secondary sidewalk along entrance road
- Dumpster access
- Emergency exit areas
- Drop inlets, drains, hydrants