Stafford Campus

 

STAFFORD CAMPUS  SNOW AND ICE MANAGEMENT PLAN

           

First Priority:  

(Priority I Level responsibilities shall be maintained continuously until the end of the snow/ice event.)

Emergency vehicle access – A minimum of a single lane from the Village Parkway entrance to the parking lot area adjacent to the main entrance of each building and the service roads.                                       

Second Priority:

(Priority II Level responsibilities shall be cleared Monday through Saturday by 7:30 a.m.  Monday through Friday, these areas will be maintained until 10:30 p.m., Saturdays until 5:30 p.m.  Snow removal and ice management will be done in order of the following priorities.)

Roadway from Village Parkway entrance to the south parking lot and to the main entrances of both buildings and service areas of both buildings

South Parking Lot

North Parking Lot

Main sidewalks and main entrances of both buildings and sidewalk connecting buildings

South Parking to North Parking lot sidewalk

Clear pedestrian access at handicap parking spaces in both North and South parking lots allowing good footing from vehicles to the sidewalk

Third Priority:

(Priority III Level responsibilities must be cleared by 3 PM, after priority II areas are completed.)

Forth Priority:

((Priority IV responsibilities must be cleared as soon as practical or as directed, not to exceed 24 hours after the end of the snow/ice event.)

Secondary sidewalks and entrances

Loading docks

Dumpster access

Emergency exit areas

Drop inlets, drains, hydrants